Reece 59-83

Decorative Stitching Machine

APPAREL EQUIPMENT

MAINTENANCE CHECKS

CLASS59•DIVISION 83

To hsip insure smooth operation of the AMF Decorative Stitching Machine, the following preventative maintenance should be performed daily, weekly and monthly as indicated:

Daily

1. Clean bottom looper roller, roller must turn freely.

2. Remove any thread and lintfrom thread drum.

Weekly

1. Clean and oil both needle bars.

2. Check for worn,retaining rings and pins.

3. Make sure needle stops are clean.

4. Make sure needle stop springs are clean and not broken.

5. Reset needle release.

6. Clean top and bottom loopers,check timing.

7. Check beltsfor proper tension and alignment.

8. Check tension finger timing and clean wax from same. Should be polished or replaced if there is a grove or burs.

9. Oil machine and-igreaoo goarci i

From the Library of Superior Sewing Machine & Supply LLC

Made with FlippingBook flipbook maker